Background Image
Previous Page  17 / 88 Next Page
Basic version Information
Show Menu
Previous Page 17 / 88 Next Page
Page Background

News

Corporate

January 2013

15

www.read-eurowire.com

After nine months of construction,

Dresden lubrication specialist Elaskon has

put its new laboratory into operation.

With a footprint of around 400m

2

,

€350,000 has been invested in the

structure alone. Taking into account the

investment in laboratory technology the

overall costs run to something like €1.2

million.

Ideal conditions for the further financial

success of the company have been

created through the modern laboratory.

Once the new production facilities started

operation in 2003, and with the opening

of the logistics centre in 2008, the

construction of the laboratory is the third

of a total of four large-scale investments

on the company’s premises. Later this year

a new filling and storage hall will be built

for the wide range of corrosion-protection

and lubrication products and release

agents.

Elaskon has sustained its position in the

wire rope lubricant field for decades, now

exporting to 56 countries. Five out of a

total of 72 staff work in the lab, in both

quality control and in the development of

new products.

As a result of the broad demand for

care products that go beyond corrosion

protection Elaskon has greatly extended

its range over the last few years.

Along with the established corrosion-

protection products, upholstery cleaning

agents, paint-care merchandise and

a multifunctional oil for every kind

of mechanical application have been

launched.

Elaskon Sachsen GmbH & Co KG –

Germany

Website

:

www.elaskon.de

New €350,000 laboratory starts operation

The newly opened laboratory