Projects

Case Study:

Ballards of Finchley Installation of ATL bay

EQUIPMENT REQUIRED:

• Class VII Scissor ATL Package with Emissions

• 2 CCTV viewing cameras

ADDITIONAL WORK REQUESTED:

• Cut an opening in an external wall to create

a new workshop doorway

• Move existing pipework to accommodate

the new doorway

• Reclad the building exterior

• Build a drive-on ramp access to the new doorway

• Remove an interior wall to open out the bay area

• Finish the floor with a resin coating and line painting

This was a unique project in which a new workshop doorway required to be cut into an external wall in order to accommodate a

one-way drive-thru Class VII ATL layout.

Can you turn this dead space into money-making space?

“Our solution will allow this premises to maximise its revenue potential,

turning what used to be dead space into a full Class VII bay“

Paul Darbyshire Workshop Solutions Projects Manager