Water
2017-2021 FINANCIAL PLAN
2016 ACCOMPLISHMENTS
Continued the development of servicing strategies for the Abbey Ridge LAP,
Redwood Heights NCP, Newton Town Centre LAP and City Centre NCP.
Updated and enforced the City’s Water
Shortage Response Plan; and
Completed water conservation
education in 150 school classes.
Achieved over 95% compliance of the
annual testing of backflow preventers;
and
Initiated a pilot project to monitor the
chlorine residual in the water
distribution system.
Worked with Metro Vancouver on the
construction of Port Mann
2
nd
Fraser
River crossing; and
Replaced 11 km of aging water mains.
Reduced unaccounted water loss
through water pressure management
by reducing the hydraulic grade line in
all pressure zones in the City; and
Completed leak detection pilot survey
on 168 km of water mains.