© SBM Offshore 2012. All rights reserved.
www.sbmoffshore.com31
2. Process Safety Time – Optimise
Optimise?
• Reduce trip setpoint
• Relax allowed pressure rise (e.g. design pressure + 15%)
• Optimise modelling of pressure rise (e.g. including hold-up time of full
inventory instead of just vessel)
• Model SDV movement (as valve closes, it starts to restrict the flow)