© SBM Offshore 2012. All rights reserved.
www.sbmoffshore.com32
3. Redesign: slow down hazard development
Design-in a “surge dampening vessel” or:
Speed limitation of choke
• Manual gearing (or speed limitation for actuated choke)
• Asses fastest realistic opening time
• Re-calculate PST for reactive function