Table of Contents Table of Contents
Previous Page  16 / 288 Next Page
Information
Show Menu
Previous Page 16 / 288 Next Page
Page Background

16 |

Ten-Year Network Development Plan 2017 Main Report

Image courtesy of Gascade

1.4 Structure of the Report

This section presents the chapters composing the

TYNDP report. Each chapter is complemented by

specific Annexes available in electronic format.

The two first chapters, the Demand chapter and

Supply chapter, set the scene for the assessment.

The

Demand chapter

recalls historical development, provides an analysis per sector,

describes in detail the demand scenarios and how they achieve the EU 2030 energy

and climate targets, informs on the commodity prices retained and provides a

detailed analysis of the data for the different scenarios. This data has been collected

from the European TSOs, or derived by ENTSOG applying consistent elaborations to

this data for the EU Green Revolution scenario. This chapter is supported by Annex

C1 where TSOs have provided insight on the data they have submitted for the differ-

ent scenarios, Annex C2 which contains all demand data, Annex C3 which provides

the power generation assumption data and Annex C4 on demand methodology.

The

Supply chapter

shows the evolution of supplies and details the supply potentials

retained. Supply potentials are built on the data publicly available from govern­

mental sources and other recognised institutions or publications. The chapter

includes an analysis by GLE of the embedded diversification of LNG. The chapter

also provides the supply potentials for biomethane as collected from the TSOs in

accordance with the storylines of the different scenarios. The supply potentials serve

as basis for the Supply Adequacy Outlook and to define the possible range for each

supply as part of the analysis and calculation of indicators composing the TYNDP

multi-criteria assessment. This chapter is supported by Annex C5 which provides all

supply data.