52

SUMMARY OF ONGOING PROJECTS

ENVIRONMENTAL IMPACT

The environmental impact derived

from forestry operations in general are

evaluated through operational monito-

ring carried out by the managers or

supervisors of these activities, during

or after their performance.

The following graph shows the

frequency of deviations in internal

monitoring in accordance with the

non-compliance aspect (quality, legal/

administrative, environmental, etc.)

Environmental accidents are reported

by the supervisors and the correspon-

ding mitigation measures must be

taken.

Other potential measurable impacts

in the medium or long-term continue

to be assessed: for example, the impact

of harvesting techniques on the conser-

vation of the physical and chemical

characteristics of the soil and water

quality in the harvest areas.

Project

Objective

Localisation

Stage Project from the start

Period to the

results

Study in paired basins

Examining the effect of eucalyptus

forest plantations on the water

balance at a local and regional

level, as well as the quality of the

surface water

“La Nueva Esperanza” (LNE)

establishment in the vicinity of the

town of Paso de los Mellizos (Río

Negro)

El Viraró (EV) establishment, close to

the town of Los Cuadrados

(Tacuarembó)

LNE:

2007-2010 Calibration

2011 Start of Monitoring

EV: 2011-2014 Start of Calibration

Long-term

(20 years)

Hydrogeological

Monitoring Plots

Look for correlations between

variations in the level of groundwater

deposits, rainfall and

Eucalyptus

forest plantations

We selected the most relevant

geological formations (as potential

aquifers): Asencio, Guichón and

Salto (Coast) and Tacuarembó.

2010 start of monitoring at the 3 plots

along the coast.

2013 monitoring started on the

Tacuarembó plot.

Medium-term (3-5 years)

Monitoring of the level of

artesian wells

Evaluate the fluctuations in the

water level of shallow aquifers with

different proximity to

Eucalyptus

forest

plantations through unused artesian

wells.

No. of wells:

14 around the town of

Grecco,

7 around Paso de los Mellizos, 5

in Pueblo Paso de la Cruz and 5 in

Soriano

Started in 2008 with the wells of

Soriano, with other locations added

over time.

Long-term

(10 years)

Quality monitoring

of surface

water.

Evaluate variations over time in the

chemical/physical and biological

properties in water basin courses

in the area of influence of the

Eucalyptus

forest plantations

Order 3 Basins (A.E Strahler

classification)

A° Quebracho (Paysandú)

A° Sarandí (Soriano)

A° Coladeras (Río Negro)

A° Pablo Páez (Cerro Largo)

A° Potrero (Florida)

2012 start of proceedings in the first 3

basins.

The other 2 basins were included in

2013

Long-term

(10 years)

Monitoring of water

quality and its suitability

for different uses

Examine the quality of the water

in facilities where there are wells

for human supply and classify this

according to fitness for use

All wells in sites under management

by UPM-FO

2010 Systematic start-up.

Annual

Monitoring of water in

the area of influence of

the Santana Nursery

Establish a base level for water

quality prior to the installation of the

nursery and monitor the long-term

evolution

6 underground water wells in the

vicinity of the nursery (residents) and

2 sampling sites in Arroyo Santana

2 monitoring wells on the Nursery

plot.

2011 Characterisation and definition of

the base level:

2011 Start of monitoring at A° Santana.

2012 start of monitoring in phreatimeter

wells.

Medium and long-term

(5 to 10 years)

ambiental

5,63

43,59

7,37

0,32

43,09

0

10 %

20 %

30 %

40 %

50 %

60 %

Calidad

legal/admin.

productividad seguridad

RELATIVE FREQUENCY OF DEVIATIONS DETECTED

Distribution of deviations in the monitoring depending on the type of non-compliance aspect.