Background Image
Previous Page  16 / 52 Next Page
Basic version Information
Show Menu
Previous Page 16 / 52 Next Page
Page Background

wiredInUSA - December 2012

16

It will produce almost a thousand chemical

products for applications in surface treatment,

metal fabrication, cleaning and sanitizing and

will operate at the highest safety and environ-

mental standards.

Chemetall has invested $25 million in the

40-acre site.

As a measure of its dedication to environmental

sustainability, Chemetall has installed a semi-

automated waste treatment system to reduce

process wastewater by 90 percent.

Automation advancements, including bulk

material handling systems, mixing vessels, and

packaging lines, have been incorporated into

the facility to increase productivity as well as

improve product yield and quality.

Surface

treatment

facility

The new Chemetall facility

in Blackman Township,

Michigan, USA is believed

to be one of the biggest surface

treatment facilities in the world.