Previous Page  69 / 72 Next Page
Information
Show Menu
Previous Page 69 / 72 Next Page
Page Background

Facebook

ADV ANC ED T E CHNOLOGY

LOCKHEED MARTIN MISSI LES & SPACE

Sunnyvale, CA

Type: Various

Size:

Over 1,000,000 SF

Projects:

§

B178 (Maintenance Facility)

§

B578 (Model Shop)

§

B182 (CRAD Office/Manufacturing)

§

B576 (Motion Simulator)

§

B562 (High Bay Access)

§

B577 and 582 (Publication and Anti-sub Warfare)

§

B152 (Clean Room)

§

B153 (Utilities Upgrade)

§

B156F (Hubble Telescope Clean Room)

§

B176 (Chemical Storage Facility Consolidation & Renovations)

§

B156A (Critical Power Upgrade)

§

B157 (Computer Lab and Testing Relocation)

§

B152 (ECG/WELD Manufacturing)

For more than ten years, Lockheed has chosen AlfaTech as the prime design

and construction consultant to work on a multitude of high technology projects at

their Sunnyvale campus. Most projects entailed the programming, planning

design and construction management for clean room facilities existing on this

nationally prominent Lockheed site. Numerous projects entailed the upgrading

of existing clean space to higher cleanliness levels in support of this companies

missile system production. Significant challenges were presented in these

typically “high bay” buildings.