ADV ANC ED T E CHNOLOGY
LOCKHEED MARTIN MISSI LES & SPACE
Sunnyvale, CA
Type: Various
Size:
Over 1,000,000 SF
Projects:
§
B178 (Maintenance Facility)
§
B578 (Model Shop)
§
B182 (CRAD Office/Manufacturing)
§
B576 (Motion Simulator)
§
B562 (High Bay Access)
§
B577 and 582 (Publication and Anti-sub Warfare)
§
B152 (Clean Room)
§
B153 (Utilities Upgrade)
§
B156F (Hubble Telescope Clean Room)
§
B176 (Chemical Storage Facility Consolidation & Renovations)
§
B156A (Critical Power Upgrade)
§
B157 (Computer Lab and Testing Relocation)
§
B152 (ECG/WELD Manufacturing)
For more than ten years, Lockheed has chosen AlfaTech as the prime design
and construction consultant to work on a multitude of high technology projects at
their Sunnyvale campus. Most projects entailed the programming, planning
design and construction management for clean room facilities existing on this
nationally prominent Lockheed site. Numerous projects entailed the upgrading
of existing clean space to higher cleanliness levels in support of this companies
missile system production. Significant challenges were presented in these
typically “high bay” buildings.