ADV ANC ED T E CHNOLOGY

CISCO SYSTEMS

San Jose, CA

Type:

Rack Lab

Size:

10,000 SF

AlfaTech provided mechanical, plumbing, fire protection, and electrical

engineering services for the expansion of the rack lab in Cisco Building 16 for

SPRTG, affecting approximately 10,000 square feet. The scope of work included

adding new lab electrical systems (transformers fed from the existing building

electrical service) and chilled water distribution and CRAH units (fed from the

existing chilled water system). In order to facilitate the additional space required,

large conference room resources were relocated from the 1st floor to the 3rd

floor under a separate design-build contract. In addition to the MEP design

effort, AT coordinated and updated the lab rack layouts for approval by Cisco.

The typical SPRTG lab rack requires 6 to 15 kW per rack. Also included in the

scope of work were alterations to the rack layouts (related to new cabinet

dimensional requirements) as well as electrical modifications related to the

existing power distribution to the existing first floor lab spaces.