Table of Contents Table of Contents
Previous Page  1326 / 1578 Next Page
Information
Show Menu
Previous Page 1326 / 1578 Next Page
Page Background

Recently… New identical Linac…

Why did QART fail?

Also weekly Matrix measurements are performed.

But

a

different algoritm is used for this.

MU-check accepts 10% deviations. In general, for the existing

HD MLC with 2.5 mm leaves the deviations were already a bit

bigger than for other linacs with other MLCs.

The institution started to use another HD MLC model. Looking

back at all the data, a systematic deviation could be detected.

( this is a strong argument for statistical proces analysis, SPC!)

An RPC audit had been conducted.

But

the MU’s needed were

based on the measurements, not on the TPS calculation. (not

mandatory for RPC check-this is now mandatory).