July 2008 Tube Products International

61

The specifications resulted

in a challenging pressure

resistance of 4 bar together

with a parallel loading of

diameter SN10,000. Fiberpipe

fulfilled these requirements

with a sanded, cross-wound

pipe. A short reconstruction

time of only a few days was

required. To avoid time-

consuming

laminated

connections, Fiberpipe con-

structed a pipeline with key

lock and double O-ring,

absorbing the axial forces

on the pipeline. Due to this

innovation, Fiberpipe reduced

the assembly time and costs

by 80%. Accurate planning

shortened the assembly time, resulting in a

minimal downtime for the factory.

According to plan, the reconstruction took place

within five days, in October 2007. Preparation,

delivery and assembly were carried out as a

complete solution offered by Fiberpipe.

‘Pipeline-on-demand’

Evonik Steag GmbH operates

two coal power stations. The

usable current supply is 10.328

Gigawatt hours per year.

The installation components

are two pulverised coal fired

Benson boilers with fluid

deashing (each 980t/h), two

pulverised coal fired Benson

boilers with dried deashing

(2.160t/h), as well as two turbo

generators.

At irregular intervals, repair

materials such as replacement

pipeswereneededatthepower

plant. The operating company

has entrusted Fiberpipe with

a 24-hour service. The pipe

company acts as an extended

warehouse to the operating

company. Essential to this service is a generously

proportioned stock and quick response times.

Instant service in FGD

E.ON-Kraftwerke’s power plant at Ingolstadt is

operated with heavy fuel oil. The blocks provide

a capacity of 386 MW and are mainly used for

backing of peak load and medium load.

Spool of a cooling water line: waste incineration in Rotterdam

Tailor-made fabrication: winding of an FRP pipe with diameter 1,000mm