July 2008 Tube Products International
61
The specifications resulted
in a challenging pressure
resistance of 4 bar together
with a parallel loading of
diameter SN10,000. Fiberpipe
fulfilled these requirements
with a sanded, cross-wound
pipe. A short reconstruction
time of only a few days was
required. To avoid time-
consuming
laminated
connections, Fiberpipe con-
structed a pipeline with key
lock and double O-ring,
absorbing the axial forces
on the pipeline. Due to this
innovation, Fiberpipe reduced
the assembly time and costs
by 80%. Accurate planning
shortened the assembly time, resulting in a
minimal downtime for the factory.
According to plan, the reconstruction took place
within five days, in October 2007. Preparation,
delivery and assembly were carried out as a
complete solution offered by Fiberpipe.
‘Pipeline-on-demand’
Evonik Steag GmbH operates
two coal power stations. The
usable current supply is 10.328
Gigawatt hours per year.
The installation components
are two pulverised coal fired
Benson boilers with fluid
deashing (each 980t/h), two
pulverised coal fired Benson
boilers with dried deashing
(2.160t/h), as well as two turbo
generators.
At irregular intervals, repair
materials such as replacement
pipeswereneededatthepower
plant. The operating company
has entrusted Fiberpipe with
a 24-hour service. The pipe
company acts as an extended
warehouse to the operating
company. Essential to this service is a generously
proportioned stock and quick response times.
Instant service in FGD
E.ON-Kraftwerke’s power plant at Ingolstadt is
operated with heavy fuel oil. The blocks provide
a capacity of 386 MW and are mainly used for
backing of peak load and medium load.
▼
Spool of a cooling water line: waste incineration in Rotterdam
▲
Tailor-made fabrication: winding of an FRP pipe with diameter 1,000mm