ERW TUBE MILL
TM14 API
Installed in Russia
ERW TUBE MILL
TM10
Installed in Russia
ERW TUBE MILL
TM8
Installed in Vietnam
ADDAFER.ITTube Diameter
159,0 - 355,6 mm.
Wall Thickness
4,0 - 12,7 mm.
Tube Length
6,0 - 13,0 m.
Working Speed
0 - 35 m./min.
Tube Diameter
127,0 - 273,0 mm.
Wall Thickness
2,0 - 6,0 mm.
Tube Length
6,0 - 12,0 m.
Working Speed
0 - 50 m./min.
Tube Diameter
89,0 - 219,1 mm.
Wall Thickness
3,0 - 8,0 mm.
Tube Length
6,0 - 12,0 m.
Working Speed
0 - 50 m./min.
ADDA FER MECCANICA S.r.l. | via Giulio Natta, 9 | 24030 Mapello (BG) | T. +39 035 493 2174 | F. +39 035 494 6564 |
www.addafer.it|
info@addafer.itADDA FER @ NEXT TUBE DUSSELDORF FROM 4
TH
TO 8
TH
APRIL 2016
HALL 6 - BOOTH # D02