Background Image
Table of Contents Table of Contents
Previous Page  19 / 64 Next Page
Information
Show Menu
Previous Page 19 / 64 Next Page
Page Background

17

www.read-wca.com

Wire & Cable ASIA – May/June 2017

Industry

news

ABU Dhabi-based Masdar has

acquired a stake in Hywind Scotland, a

30MW floating offshore pilot wind farm

in the North Sea. Through the

transaction, Statoil and Masdar have

agreed to share the development risk

and Masdar will cover 25 per cent of

previous and future costs.

Due to start commercial operation in

late 2017, Hywind Scotland is the

world’s first floating offshore wind

farm. The objective of the Hywind

pilot farm is to demonstrate

cost-efficient and low risk solutions

for future commercial-scale floating

wind farms.

“Having met with representatives of

Masdar at the Abu Dhabi International

Petroleum Exhibition and Conference

(ADIPEC) late last year, I am greatly

encouraged by this substantial

international investment in Hywind

Scotland,” said Keith Brown, cabinet

secretary for the economy and fair

work, Scottish Parliament.

“This pilot project aims to take

advantage of Scotland’s huge offshore

wind resource by operating in waters

exceeding 100m depth, demonstrating

cost efficient and low risk solutions for

commercial scale parks.

“Major investments, such as this one

made by Masdar, highlight the

importance of continued investment in

offshore wind, are a sign of increasing

confidence within the sector, and

position Scotland at the forefront of the

global race to develop the next

generation

of

offshore

wind

technologies.”

Located off the Aberdeenshire coast,

Hywind Scotland covers an area of

around 4km

2

and consists of five 6MW

floating wind turbines anchored to the

seabed.Hywind Scotland is the second

offshore wind partnership between

Masdar and Statoil after the 402MW

Dudgeon Wind Farm.

Masdar – United Arab Emirates

Website

:

www.masdar.ae

Pilot farm gets new Abu Dhabi investor

Cable bid

China Power Complete Equipment Co

Ltd has accepted a bid from ZTT

Group to provide cables and

accessories for its Binhai North phase

2 wind farm.

The bid, of €40.8 million, covers the

supply of cables and accessories

manufactured in ZTT’s submarine

cable factory in Jiangsu. Delivery was

expected in April 2017.

The Binhai North phase 2 is under

development by the State Power

Investment Corporation (SPIC). The

wind farm comprises 100 4MW wind

turbines and a 400MW substation,

which will be installed approximately

22km offshore.

China Power Complete Equipment

Co Ltd – China

Website

:

www.cpcec.com