Table of Contents Table of Contents
Previous Page  47 / 127 Next Page
Information
Show Menu
Previous Page 47 / 127 Next Page
Page Background HU HU

n/a

HU

n/a

n/a

HU HU

HU*

HU HU*

n/a

n/a

n/a

HU

IE

n/a

IE

n/a

n/a

n/a

IE

IE*

IE IE

n/a

IE

– 

4)

IE

IT IT

IT

n/a

n/a

IT IT IT IT IT

n/a

n/a

n/a

IT

LT LT/ LT LT

n/a

n/a

LT

LT

LT*

n/a

n/a

– 

5)

LT

NL NL

n/a

NL NL NL link1 link2

n/a

link1 link2 NL

NL*

NL

n/a

n/a

NL

PL PL PL/ PL PL

n/a

n/a

PL PL H–gas L–gas TGPS H–gas L–gas TGPS

PL*

n/a

PL PL

PL

– 

7)

– 

6)

PT

n/a

n/a

PT PT PT PT PT PT

n/a

n/a

PT

RO RO RO

n/a

n/a

n/a

RO

RO RO

n/a

RO

– 

8)

RO

SE

n/a

n/a

n/a

n/a

n/a

n/a

n/a

SE

SE SE SE

– 

9)

SE

SI SI SI/ SI SI

n/a

n/a

SI SI SI SI SI

n/a

n/a

n/a

SI

SK

n/a

SK

n/a

n/a

n/a

SK SK

SK

SK

SK

n/a

SK

– 

10)

SK

UK–GB UK–GB

n/a

UK–GB

n/a

n/a

UK–GB

UK–

GB**

UK–GB UK–GB

UK–GB*

n/a

n/a

n/a

UK-GB

UK–NI UK–NI UK–NI/ UK–NI

n/a

n/a

n/a

UK–NI

UK–

NI***

UK–NI UK–NI

UK–NI*

n/a

UK–NI UK–NI

UK-NI

(Annual) costs, frequency,

quantities of balancing actions

(art. 9.4)

Marginal buy/sell price

(in Engl.) (art. 10.5)

Balancing services: call for

tenders and results

Daily imbalance charge

calculation methodology

Public consultation on WDOs

(art. 26.4).

WDO recommendation document

(art. 26.6)

Approved methodology –

calculation of neutrality

charges (art. 30.2).

Monthly aggregated neutrality

charges for balancing (art. 29.4)

Overall status of transmission

system (art. 32.1)

TSO balancing actions (art. 32.2)

NU’s inputs and off-takes for

gas day (art. 32.3)

Linepack flexibility service

documents

Interim imbalance charge

Updated Interim measures

Report approved

PROVIDED LINKS

REGARDING OPERA-

TIONAL BALANCING

PUBLICATION

PROVIDED LINKS

REGARDING DAILY

IMBALANCE CHARGE

PROVIDED LINKS

REGARDING WDOS

PUBLICATION

PROVIDED LINKS

REGARDING

NEUTRALITY

PUBLICATION

INFORMATION

PROVISIONS

LINEPACK

FLEXIBILITY

INTERIM MEASURES

4) In Ireland, the focus of TSO, Regulator and industry has been on moving forward towards implementing an enduring balancing solution.

It has been agreed by the Regulator and industry that the TSO will proceed to issue a tender for the provision of Trading platform services to the

TSO, for the purposes of undertaking Balancing Actions. The TSO has also consulted on the imbalance cash-out prices and will issue a final

proposal in early 2017.

5) In Lithuania, the updated report is being prepared at the moment.

6) In Portugal, publication is not applicable as the BAL NC was implemented by 1 October 2016.

7) In Portugal, according to the NRA's decision, Mibgás, S.A., operating the Spanish Trading platform at the Spanish VTP (PVB) shall be the future

Market Operator in Portugal, which is currently delayed due to administrative legal hindrances.

8) In Romania, TSO requested from NRA an extension until December 2017 for the preparation of the updated report on the application of interim

measures.

9) In Sweden, an updated annual report was sent to NRA on 2 January 2017.

10) In Slovakia, link to the publication is not available.

ENTSOG BAL NC Monitoring Report 2016 |

47