PROVIDED LINKS
REGARDING OPERATIONAL
BALANCING PUBLICATION
PROVIDED LINKS
REGARDING DAILY
IMBALANCE CHARGE
PROVIDED LINKS
REGARDING WDOS
PUBLICATION
PROVIDED LINKS
REGARDING NEUTRALITY
PUBLICATION
INFORMATION PROVISIONS
LINEPACK FLEXIBILITY
INTERIM MEASURES
Table 1.3: Overview of the provided publication links per country
(Annual) costs, frequency,
quantities of balancing actions
(art. 9.4)
Marginal buy/sell price
(in Engl.) (art. 10.5)
Balancing services: call for
tenders and results
Daily imbalance charge
calculation methodology
Public consultation on WDOs
(art. 26.4).
WDO recommendation document
(art. 26.6)
Approved methodology –
calculation of neutrality
charges (art. 30.2).
Monthly aggregated neutrality
charges for balancing (art. 29.4)
Overall status of transmission
system (art. 32.1)
TSO balancing actions (art. 32.2)
NU’s inputs and off-takes for
gas day (art. 32.3)
Linepack flexibility service
documents
Interim imbalance charge
Updated Interim measures
Report approved
AT ATn/a
AT_
AT_
_
AT AT AT*n/a
n/a
n/a
AT
BE/LU BE/LUn/a
BE/ LU BE/ LU BE/L U BE/LU
BE/L U BE/LU BE/LU BE/LUn/a
n/a
n/a
BE/LU
_
_
_
n/a
BG_
BG_
BG_
_
n/a
BG_
1)
BG
CZ CZ CZ CZn/a
n/a
_
_
CZ CZ CZ_
n/a
n/a
CZ
DE Gaspool NCGGaspool:
link1/ ink2/ link3/ link4 NCG Gaspool NCG link1 link2 Gaspool,
NCG DE Gaspool,
NCG NCG Ga- spool NCG GaspoolDE*
n/a
n/a
Gaspool, NCGDE
DK DKn/a
DKn/a
n/a
n/a
n/a
DK DK DKn/a
n/a
n/a
DK
EL EL ELn/a
n/a
n/a
EL_
EL EL ELn/a
EL_
2)
EL
ES ESn/a
ESn/a
n/a
ESES
3)
ES ESES*
n/a
n/a
n/a
ES
GRTgaz; TIGF GRTgaz TIGFn/a
GRTgaz,
TIGFn/a
n/a
FR
GRTgaz, TIGF GRTgaz TIGF GRTgaz TIGF GRTgazTIGF*
GRTgaz/
TIGFn/a
n/a
FR
HR HR HR/ HR HRn/a
n/a
_
_
HR HR HRn/a
n/a
n/a
HR
* Information is considered confidential and is provided via secured platform.
** UK-GB do not publish this information but provide the details to each shipper on a monthly basis via their neutrality statements.
*** UK-NI published the information on shipper invoice backing data.
1) Bulgartransgaz shall update and submit the annual report to the NRA after 6 months of implementation of the new Balancing regime.
2) DESFA’s current consideration is that submission of an updated version of the report on Interim Measures is not necessary, since:
a) Most of the measures included in the report (e.g. reduction of tolerance levels, revision of resale scheme, full re-nomination cycles)
have already been incorporated in DESFA’s proposal for the 3
rd
revision of the Network Code;
b) The rest of the proposed measures are expected to be implemented according to schedule.
3) In Spain, the information is provided through the IT system SL-ATR (Logistics System for Third Party Network Access).
46 |
ENTSOG BAL NC Monitoring Report 2016