Gasoline Overfill Protection

Safety Instrument System Stage 1 Functional Safety Assessment

P & I Design Ltd

DOCUMENT NO: SI277014_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: C DATE: 16.02.12

Tel: + 44 (0)1642 617444

PAGE 10 OF 12

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

The proof testing philosophy was discussed and it was confirmed that the functional test will

be an end to end test with a simulated high high level derived from the level switch. The

switches cannot be fixed in the override position.

It was confirmed that there was no requirement for any additional SIFs to support abnormal

modes of operation (Start-up, maintenance, testing etc.)

The Compliance Documentation will be completed up to stage 1

3.3

Project Design Change Procedures are in place and have been properly implemented

.

The project design procedures are in place and an audit trail is available for the lifecycle of

the system. At this FSA the documentation was at the following revisions.

LOPA Study

SI057001_RPT

D (08/07/10)

SIS Safety Requirements Specification

SI277010_RPT

B (03/12/10)

SIS Management of Functional Safety

SI277102_RPT

A (09/12/10)

SIS Compliance Document

SI277101_RPT

B (27/11/10)

Safety Instrument System Design package is to be reviewed at FSA Stage 2/3.