Gasoline Overfill Protection

Safety Instrument System Stage 1 Functional Safety Assessment

P & I Design Ltd

DOCUMENT NO: SI277014_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: C DATE: 16.02.12

Tel: + 44 (0)1642 617444

PAGE 12 OF 12

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

4.0

CONCLUSIONS

The overall conclusion of this FSA is that the storage installation had been risk assessed and

the automatic overfill protection system specified to provide an appropriate level of

functional safety. A further LOPA along the PSLG guidelines will need to be conducted

prior to any change of use to allow gasoline storage. A number of detailed recommendations

have been made where either relevant elements of the overall BS EN 61511 lifecycle have

not yet been completed, or where improvements could be made to the information package

that has been prepared to support the project.

Comments noted above will be incorporated Safety Requirement Specification and the

system will be revised to Stage 1 FSA Status.

Actions, listed below, arising from this FSA will be completed within 2 weeks

Action

By

Expected

Completion

Completion

Date

1. Modify SRS as discussed in

the FSA

DSR

21/12/10

21/12/10

2.

Confirm level switch

lengths and high high level

activation point for all

tanks.

SW

21/12/10

04/05/11

3.

Complete Compliance

Document up to FSA Stage

1.

DSR

21/12/10

21/12/10

4.

FSA, Compliance

Document, Management of

Functional safety, SRS &

LOPA to be issued to

Immingham Storage

DSR

21/12/10

21/12/10

5.

Review and Modify LOPA

in line with PSLG

guidelines.

ISCo/P&I Design Ltd.

Prior to any

Gasoline

Storage on

site

31/08/11