Section 1
GENERAL STANDARDS
15 C 1234
Example:
15C1234
Discipline Identifier
C
Engineering
D
Architecture
L
Environmental
S
Survey
Note: When a project is created without a signed contract the
accounting dept. adds a “P “ as a prefix to the project number
(P15C1234). This is for accounting/timesheet purposes only.
Project directory folders and filenames DO NOT include the “P”
Year
Discipline Identifier
Job Number
A template Project Directory folder is
located at:
F:\+ Job Folder
It is required that you copy this folder to
the correct network drive location, then
rename folder to the assigned project
number.
(Example G:\Jobs15\15C\15C1234)
DO NOT create any folders that are not on the
list until it has been approved by all departments.
Please leave the structure intact for commonality
between projects.
Please do not remove the folders that you believe
will not be used.
During Project Closeout, empty subfolders may be
removed.
Note: When working for CTDOT - See Sect. 8 for an
additional project subfolder, not shown here, that will
need to be created using CTDOT
standards.
OVERALL JOB FOLDER LAYOUT
+
PROJECT NUMBER
+
PROJECT DIRECTORY STRUCTURE
> > >