Table of Contents Table of Contents
Previous Page  1 / 349 Next Page
Information
Show Menu
Previous Page 1 / 349 Next Page
Page Background

P & I Design Ltd

Process Instrumentation Consultancy & Design

2 Reed Street, Gladstone Industrial Estate,

Thornaby, TS17 7AF, United Kingdom.

Tel. +44 (0)1642 617444 Fax. +44 (0)1642 616447

Web Site:

www.pidesign.co.uk

INTER TERMINALS IMMINGHAM LTD

EAST TERMINAL

4 EAST RAIL LOADING I/E

DOCUMENTATION MANUAL

Rev

Date

By

Checked

Approved

Description

Client Ref.

A

15.04.99

D.Smith

DRR

DRR

Original Issue

B

26.07.99

D.Smith

DRR

DRR

As Built

C

26.04.11

D.B.Faulkner

MM

MM

Mabanaft Modifications (SI760)

D

06.12.11

D. Smith

MM

MM

General Update

Document No.

SI039001_MNL

E

24.01.17

D. Smith

MM

MM

GOMC Batching System Update

F

12.06.17

D. Smith

MM

MM

Control Panel Layout Update

IF NOT SIGNED THIS DOCUMENT IS UNCONTROLLED