SI039001_MNL
1

Registers
4

SI039001_RGD_E - Drawing Register 4 East Rail Loading
4

SI039000_SPC_B - Spec Register 4 East Rail Loading
6-7

SI039001_REG_C - Report Register 4 East Rail Loading
10

SI039002_REG_A - PICAL Register 4 East Rail Loading
11

1. Reports
12

SI760001_RPT_B - 4 East Rail Loading System Modifications URS.pdf
12

2. Specifications
21

SI039002_SPC_A - Pump Stop Start
21

SI039004_SPC_ B Operator Control Panel
23

SI039005_SPC_A - ESD
25

SI039006_SPC_A Sounder
27

SI039007_SPC_A DC JB
29

si039008_SPC_A AC JB
31

SI039009_SPC_A SOV
33

SI039010_SPC_A ANTI-CONDENSATION HEATER
36

SI039011_SPC_A PSU _Armah Supplied_
38

SI039012_SPC_A MUX
40

SI039013_SPC_A FX2N128MR PLC & COMMS MODULE
42

si039014_SPC_B 3 Pole Ex-Isolator
45

si039015_SPC_A Control Panel
48

si039016_SPC_A MCC
51

si039017_SPC_A Mux Panel
54

SI760001_SPC_A - Pump Dry Run Level Switch
57

SI760002_SPC_B - Exd Solenoid Valves
59

si039001_SPC_B - 6 Pole Ex-Isolator.pdf
18

3. Drawings & Schedules
62-63

SI039001_DWG_F - 4E Rail Loading System Overview
62-63

SI039002_DWG_F - 4E Rail Loading Logic Drawing 1 (001 to 120)
64-65

SI039003_DWG_C - 4E Rail Loading Logic Drawing 2 (121 to 240)
66-67

SI039004_DWG_C - 4E Rail Loading Logic Drawing 3 (241 to 360)
68-69

SI039005_DWG_C - 4E Rail Loading Logic Drawing 4 (361 to 480)
70-71

SI039006_DWG_C - 4E Rail Loading Logic Drawing 5 (481 to 600)
72-73

SI039007_DWG_D - 4E Rail Loading Logic Drawing 6 (601 to 720)
74-75

SI039008_DWG_D - 4E Rail Loading Logic Drawing 7 (721 to 840)
76-77

SI039009_DWG_C - 4E Rail Loading Offloding Pump 1 MCC Wiring
78-79

SI039012_DWG_F - 4E Rail Loading MUX 1 & 2 Panel Loop Sheet
80-81

SI039013_DWG_F - 4E Rail Loading MUX 3 & 4 Panel Loop Sheet
82-83

SI039014_DWG_E - 4E Rail Loading Danload to PC Comms Diagram
84-85

SI039015_DWG_B - 4E Rail Loading Mercury Keypad Comms Diagram
86-87

SI039016_DWG_F - 4E Rail Loading Control Panel Layout
88-89

SI039017_DWG_A - 4E Rail Loading Pump Local JB Terminal Arrangement
90-91

SI039018_DWG_A - 4E Rail Loading DC JB Terminal Arrangement
92-93

SI039019_DWG_A - 4E Rail Loading AC JB Terminal Arrangement
94-95

SI039020_DWG_D - 4E Rail Loading Operator Control Panel Layout
96-97

SI039022_DWG_B - 4E Rail Loading Logic Drawing 8 (841 to 960)
98-99

SI478006_DWG_I - P2_25 Pump MCC Wiring Diagram
100-101

SI760001_DWG_E - 4E Rail Loading P2-25 Junction Box Interconnection
102-103

SI760002_DWG_B - 4E Rail Loading P5-12 Junction Box Interconnection
104-105

SI760005_DWG_B - Tanks 601, 602 & 603 Rail Loading Valve Loop Sheet
106-107

SI039100_SCH_E - FINA DERV Cable Schedule
108-109

SI760001_SCH_A - 4 East Rail Loading Cable Schedule
116-117

SI760002_SCH_A - 600 Series ROSOV Cable Schedule
118-119

SI760100_SCH_B - 4 East Rail Loading Trip Matrix
120-121

4.1 Installation & Testing Procedures
122

SI760001_INS_A - 4 East Rail Loading Modifications
122

SI760002_INS_A - 600 Series ROSOVs Scope of Work
220

4.1 Installation & Testing Procedures
234

SI760001_INS_A - 4 East Rail Loading Modifications
234

SI760002_INS_A - 600 Series ROSOVs Scope of Work
332

4.2 Calibration & Test Certificates
346

PICAL Certificate LS2-25-0
346

Armah Test Certificates
347

4.3 Handover Certificates