Table of Contents Table of Contents
Previous Page  33 / 58 Next Page
Information
Show Menu
Previous Page 33 / 58 Next Page
Page Background

H

29

September 2017

NOTE:

For quoting/ordering instructions, see Assemblies section.

(1)

See Suspension Clamp section for standard and high temperature

conductor suspension clamp options.

(2)

See Armor Rod section for rod set based on conductor application.

Item Part Number

Description

Quantity

Material

UBS lb

1

AS50BNK

Anchor Shackle

2

Forged Steel

60,000

2

HOO5024

Oval Eye Ext. Link (24")

2

Forged Steel

60,000

3

See Chart

Insulator, ANSI 52-11

2

Polymer

4

SYC50SN

Socket Y-Clevis

2

Ductile Iron

50,000

5

YPV5019011

Yoke Plate

1

Ductile Iron

50,000

6

See Note 1

Suspension Clamp w/Y-Clevis Eye

2

Aluminum

7

See Note 2

Armor Rods

2

Aluminum

Line Voltage (kV)

Quadri*Sil® Part Number

Section Length Inches

SML lb

Corona Ring

230

S050073S201A

87.6

50,000

8”Line End

345

S050103S201B

117.8

50,000

12”Line End

EHV Tangent Suspension, 2-Bundle Conductor

V-String 50k lb Assembly, 230kV - 345kV

6

5

3

2

1

4

Ø1.25

Lifting

Hole

7

Clamp

Assembly

Length

Section

Length

0.88

6.07

Ø.75

45.0˚

18.00

7.70

2.75

24.00

3.50

Base Assembly Bill of Material

Typical Insulator Selection

ASSEMBLY

TAT22