Table of Contents Table of Contents
Previous Page  35 / 58 Next Page
Information
Show Menu
Previous Page 35 / 58 Next Page
Page Background

H

31

September 2017

NOTE:

For quoting/ordering instructions, see Assemblies section.

(1)

See Suspension Clamp section for standard and high temperature

conductor suspension clamp options.

(2)

See Armor Rod section for rod set based on conductor application.

EHV Tangent Suspension, Double Conductor

V-String 30k lb Assembly, 230kV - 345kV

Item Part Number

Description

Quantity

Material

UBS lb

1

AS25LBNK

Anchor Shackle

2

Forged Steel

30,000

2

HOO3024

Oval Eye Ext. Link (24”)

2

Forged Steel

30,000

3

See Chart

Insulator, ANSI 52-5

2

Polymer

4

SYC30SN

Socket Y-Clevis

2

Ductile Iron

30,000

5

YPD5024685

Yoke Plate

1

Ductile Iron

50,000

6

YCS1690

Y-Clevis Eye

1

Ductile Iron

30,000

7

See Note 1

Suspension Clamp

2

Aluminum

8

YPW3018218

Yoke, Vertical Bundling

1

Aluminum

30,000

9

See Note 2

Armor Rods

2

Aluminum

Line Voltage (kV)

Quadri*Sil® Part Number

Section Length Inches

SML lb

Corona Ring

230

S030073S201A

85.1

30,000

8”Line End

345

S030103S201B

115.3

30,000

12”Line End

Base Assembly Bill of Material

Typical Insulator Selection

9

6

7

8

7

4

3

2

1

Clamp

Assembly

Length

1.25

Lifting

Hole

Section

Length

45°

5.07

18.00

6.28

24.00

2.78

.88

.63

2.75

5

ASSEMBLY

TAT22W