Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

M6 Interconnection Osp

The length is approximately 1.2 km.

250

1

Total

1

Schedule

Start Date

End Date

Pre-Feasibility

Feasibility

FEED

Market Test

Permitting

Supply Contracts

FID

Construction

Commissioning

2022

2022

NDP and PCI Information

Part of NDP

No (The project is not included in the

currently valid and confirmed NDP (2016-

2025), but it was included in the previous

one (2015-2024) and it will also be

included in the new one, which is in

preparation (TYNDP 2017-2026) and will

be confirmed by our regulator expectedly

in the next months. )

NDP Number

Currently PCI

No

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

No

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%