Table of Contents Table of Contents
Previous Page  556-557 / 1248 Next Page
Information
Show Menu
Previous Page 556-557 / 1248 Next Page
Page Background

LNG evacuation pipeline Zlobin-Bosiljevo-Sisak-Kozarac

General Information

Promoter

Plinacro Ltd

Operator

Plinacro Ltd

Host Country

Croatia

Status

Planned

Website

Project's URL

Publication Approval Status

Approved

Sponsors

Plinacro

100%

TRA-N-075

Project

Pipeline including CS

Non-FID

Update Date

13/07/2016

Advanced

Description

Gas pipeline Zlobin - Bosiljevo - Sisak ² Kozarac jointly with gas pipeline Omišalj-Zlobin and gas pipeline Kozarac-Slobodnica makes LNG Main

Evacuation Pipeline connecting LNG from the LNG solution on the island of Krk with Central Eastern European counties. The pipeline is a

continuation of the existing Hungary ² &URDWLD LQWHUFRQQHFWLRQ JDV SLSHOLQH 9DURVI|OG 'UDYDV]HUGDKHO\ 'RQML 0LKROMDF 6ORERGQLFD ZLOO EH

connected to the future Ionian Adriatic Pipeline (IAP) will be connected to the future LNG solution in Omišalj It will be the "backbone" of the

Croatian gas system.

Regulatory Decisions and

similar material conditions

Enabled Projects

Project Code Project Name

TRA-N-1058 LNG Evacuation Pipeline Kozarac-Slobodnica

TRA-N-90 LNG evacuation pipeline Omišalj - Zlobin (Croatia)

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

Croatia LNG

Plinacro Ltd

2020

LNG_Tk_HR

HR

50.0 GWh/d

Dravaszerdahely

Plinacro Ltd

2020

HR

HU

50.0 GWh/d

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 275 of 620

Current TYNDP : TYNDP 2017 - Annex A