Benefits

Main Driver

Others

Main Driver Explanation

Benefit Description

o The Hungarian projects taken as a whole main aim, is to enhance the flexibility of the Hungarian transmission system by connecting to neighbouring

systems, ensuring reserves flow availability, and guaranteeing flow deliverability which will enhance the transmission systems security of supply position

DORQJ ZLWK KHOSLQJ ZLWK IXUWKHU PDUNHW LQWHJUDWLRQ ,Q SDUWLFXODU WKLV SURMHFW KHOSV WKH UHYHUVH IORZ IURP 9DU|VI|OG WR %HUHJGDURF

Time Schedule

Grant Obtention Date

Delay Since Last TYNDP

Yes, 1 year.

Delay Explanation

Due to decreasing transmission volume the project was rescheduled.

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

KDMG~V]RERV]Oy &6

6

Hajduszoboszlo node

No cross-border (interconnection point) relevance.

0

Total

6