Table of Contents Table of Contents
Previous Page  117 / 189 Next Page
Information
Show Menu
Previous Page 117 / 189 Next Page
Page Background

Immingham Storage Co Ltd – Immingham East Terminal

IME-SIS1 – Safety Instrument System Equipment Failure Proof Testing Procedure

P & I Design Ltd

DOCUMENT NO: SI483019_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 09.04.14

Tel: + 44 (0)1642 617444

PAGE 19 OF 19

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

8.3

Tank 568 As Left Functional Testing Continued…

Step

Method of Test

Acceptance Criteria

Pass (

)

Fail (x)

Initial

8.3.8

Release HS568 Tank 568 Isolation

Pushbutton.

FINAL ELEMENT valve

automatically reopens initiating

DIAGNOSTICS as detailed on

SI483012_SCH Sheet 1

Comment differences from SCH in

section 8.3.12.

8.3.9

Operations to initiate Terminal Shutdown

system.

Record method of test

……………………………………….

Correct FINAL ELEMENT valve

position and DIAGNOSTICS as

detailed on SI483012_SCH Sheet

2.

Comment differences from SCH in

section 8.3.12.

Time from test initiation to trip

activation <=2 seconds.

Comment failures in section 8.3.12

8.3.10

8.3.8

Operations to Reset Terminal Shutdown

system.

FINAL ELEMENT valve

automatically reopens initiating

DIAGNOSTICS as detailed on

SI483012_SCH Sheet 1

Comment differences from SCH in

section 8.3.12.

8.3.12

Comments/Defects/ Remedial Actions

– Report ALL to System Keeper

Tested by

Position

Qualification

Sign

Date

System Keeper Acknowledgement

(Note: Signature confirms System keeper is advised of Comments/Defects/Remedial Actions and will initiate

terminal procedures for rectification works and/or isolation of plant as required)

Accepted by

Position

Qualification

Sign

Date