Immingham East Terminal – Gasoline Overfill Protection
Safety Instrument System
P & I Design Ltd
DOCUMENT NO: SI277001_RPT
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE:
F
DATE: 31.10.14
Tel: + 44 (0)1642 617444
PAGE 3 OF 29
Fax: + 44 (0)1642 616447
www.pidesign.co.uk1
REVISION HISTORY
Rev Description
A
Original Issue – Modification requested, assessed and initiated
B
Revised with extra tanks
C
Tank 709 removed, SIS modified following client discussions
D
Following Stage 3 FSA
Pipeline Valves Declassified as SIS
E
Tank-side Valve XV56701 Installed
2
SCOPE
This document has been prepared for the Safety Instrumented System IME-SIS1 to reflect the
life cycle of the SIS in accordance with BS EN 61508 & BS EN 61511 and to be a working
document throughout the life cycle of the SIS.
SCOPE
Client / Company
-
Immingham Storage Co Ltd
Location / Facility
-
ISCo East Terminal
Plant Unit
-
Tanks 561, 564 & 568
Service
-
No4 East Storage Tank Overfill Protection
SIS Tag No
-
IME-SIS1
SIF’s Tag No’s
-
TK561-SIF1, TK564-SIF1 & TK568-SIF1
SIL
-
2