Immingham East Terminal – Gasoline Overfill Protection

Safety Instrument System

P & I Design Ltd

DOCUMENT NO: SI277001_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE:

F

DATE: 31.10.14

Tel: + 44 (0)1642 617444

PAGE 5 OF 29

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

4

SAFETY LIFE CYCLE

A SIS requires to be auditable throughout each stage of its cycle. It is necessary not just at the

conceptual and design stage but also at operational and maintenance stages.

The following figure details the life cycle, the section numbers in italics relate to this

document:

Risk Analysis and

Protection Layer

Design

Section 5

Allocation of Safety

Functions to SIS or

Other Means of Risk

Reduction

Section 5

Design and

Development of Other

Means of Risk

Reduction

Section 5

Safety Requirements

Specification for SIS

Separate Document

SI277010_RPT

Design and

Development of SIS

Section 7

Installation,

Commissioning and

Validation

Separate Document

Operation and

Maintenance

Separate Document

Modification

Separate Document

Decommissioning

Separate Document