SIS FINAL ELEMENTS
Pipeline Import Valve
Tank 1 Import Valve (Future)
Tank 1 Export Valve (Future)
Tank 1 VRU Feed Valve (Future)
Tank 1 VRU Return Valve (Future)
Tank 2 Import Valve (Future)
Tank 2 Export Valve (Future)
Tank 2 VRU Feed Valve (Future)
Tank 2 VRU Return Valve (Future)
Tank 3 Import Valve (Future)
Tank 3 Export Valve (Future)
Tank 3 PUL Return Valve (Future)
Tank 4 Import Valve (Future)
Tank 4 Export Valve (Future)
Tank 4 VRU Feed Valve (Future)
Tank 4 VRU Return Valve (Future)
Tank 5 Import Valve (Future)
Tank 5 Export Valve (Future)
Tank 6 Import Valve (Future)
Tank 6 Export Valve (Future)
Tank 7 Import Valve (Future)
Tank 7 Export Valve (Future)
Tank 8 Import Valve (Future)
Tank 8 Export Valve (Future)
Tank 9 Import Valve (Future)
Tank 9 Export Valve (Future)
Tank 10 Import Valve (Future)
Tank 10 Export Valve (Future)
TESTING RESULTS
LF364012_RPT - Shutdown Conditions Proof Test
Procedure Review (P,C or F tank under test ).
Plant Preparations (P,C or F tank under test ).
Healthy and Reset (P,C or F tank under test ).
All XV's Open (P,C or F tank under test ).
SIF / Diagnostics (P,C or F tank under test).
TAG
XV162
XV123
XV124
XV155
XV156
XV121
XV122
XV157
XV158
XV129
XV130
XV159
XV126
XV127
XV160
XV161
XV118
XV119
XV116
XV117
XV114
XV115
XV110
XV111
XV108
XV109
XV106
XV107
Section
8.1.1
8.1.2
8.1.3
8.1.4
8.1.5
ACTION
Close / Inhibit
Enabled
Enabled
Enabled
Enabled
Enabled
Enabled
Enabled
Enabled
Enabled
Enabled
Enabled
Enabled
Enabled
Enabled
Enabled
Enabled
Enabled
Enabled
Enabled
Enabled
Enabled
Enabled
Enabled
Enabled
Enabled
Enabled
Enabled
Action
Confirm
Confirm
Confirm
Confirm
Confirm
DESCRIPTION
TAG TYPE CALIBRATION UNITS SET
FAILURE MODES
AC PSU Fuse Fail
L/5
Fail
N/A
N/A Fail
H
H H H H H H H H H H H H H H H H H H H H H H H H H H H
ESD DC Fuse Fail
24V/1
Fail
N/A
N/A Fail
H
H H H H H H H H H H H H H H H H H H H H H H H H H H H
XV162 ESD Open Circuit
TB4/25 - 26
LB
N/A
N/A Fail
H
XV162 ESD DB Power Fail
9L1
Tripped
N/A
N/A Tripped
H
ABBREVIATIONS
PLANT Local Fuel PLC - The Shoreham Oil Terminal
SIS - Safety Instrument System
(1) Reset Required to clear alarms.
TITLE
OIC - Output Input Fault
(2) Results P (or
P
) = Pass, C = Comments, F (or X) = Fail
ESD - Emergency Shutdown
(3) xx = Tank Number under test only.
LB - Line Break
(4) Future (Italics, Blue fill). Review if installed.
SC - Short Circuit
(5)
H - Hardwired / Hardware
(6)
SHEET 6 OF 6
S - Software
CLIENT DRG No.
REF N0. LF364003_SCH
B
APPD
DESCRIPTION
Valve Closing Time amended (Sht 2)
13.05.16 MM MM DBF
LF PLC
A 08.04.15 DBF DBF
LF364012_RPT - LFS-SIS1 Shutdown Conditions Proof Testing - Failure Mode Functional Testing
NOTES
REFERENCE DRAWINGS
REV DATE BY
MM MM LF PLC
As Built Original Issue for Review
Overfill Protection LFS-SIS1 Testing Matrix
DRN
CHK'D
ORIGIN
INTIAL & DATE ON COMPLETION