DESCRIPTION

SIS FINAL ELEMENTS

Pipeline Import Valve

Tank 1 Import Valve (Future)

Tank 1 VRU Return Valve (Future)

Tank 2 Import Valve (Future)

Tank 2 VRU Return Valve (Future)

Tank 3 Import Valve (Future)

Tank 3 PUL Return Valve (Future)

Tank 4 Import Valve (Future)

Tank 4 VRU Return Valve (Future)

Tank 5 Import Valve (Future)

Tank 6 Import Valve (Future)

Tank 7 Import Valve (Future)

Tank 8 Import Valve (Future)

Tank 9 Import Valve (Future)

Tank 10 Import Valve (Future)

SIS DIGNOSTICS MONITORING PANEL

Trip Amplifier Display

SIS DIGNOSTICS - CONTROL ROOM ANNUNCIATOR

Window (Row/Colum)

BPCS DIGNOSTICS - JETTY ANNUNCIATOR

Window

BPCS DIGNOSTICS - CONTROL ROOM SCADA

"Alarms" Screen

"Tank xx IHLA" (Note 6)

TESTING RESULTS

As Found

LF364012_RPT - Shutdown Conditions Proof Test

Procedure Review (P,C or F tank under test ).

Plant Preparations (P,C or F tank under test ).

Healthy and Reset (P,C or F tank under test ).

XV's Open (P,C or F tank under test ).

Test (P,C or F tank under test ).

Reset and enable XV's (P,C or F tank under test ).

As Left

Procedure Review (P,C or F tank under test ).

Plant Preparations (P,C or F tank under test ).

Healthy and Reset (P,C or F tank under test ).

XV's Open (P,C or F tank under test ).

Test (P,C or F tank under test ).

Reset and enable XV's (P,C or F tank under test ).

TAG

XV162

XV123

XV156

XV121

XV158

XV129

XV159

XV126

XV161

XV118

XV116

XV114

XV110

XV108

XV106

LSxx

AN001

AN001

Section

7.2.1

7.2.2

7.2.3

7.2.4

7.2.5

7.2.6

10.1.1

10.1.2

10.1.3

10.1.4

10.1.5

10.1.6

ACTION

Close / Inhibit

Close / Inhibit

Close / Inhibit

Close / Inhibit

Close / Inhibit

Close / Inhibit

Close / Inhibit

Close / Inhibit

Close / Inhibit

Close / Inhibit

Close / Inhibit

Close / Inhibit

Close / Inhibit

Close / Inhibit

Close / Inhibit

8 mA

Activated

Activated

Activated

Action

Confirm

Confirm

Confirm

Comfirm

Confirm

Confirm

Confirm

Confirm

Confirm

Comfirm

Confirm

Confirm

DESCRIPTION

TAG TYPE CALIBRATION UNITS SET

SIS TEST FUNCTION MANUFACTURES TEST FACILITY

Tank 1 Certify Test Switch

HS01

KeySw

N/A

N/A Test

H

H H

H H(1/1)

H

S

Tank 2 Certify Test Switch

HS02

KeySw

N/A

N/A Test

H

H H

H H(1/2)

H

S

Tank 3 Certify Test Switch

HS03

KeySw

N/A

N/A Test

H

H H

H H(1/3)

H

S

Tank 4 Certify Test Switch

HS04

KeySw

N/A

N/A Test

H

H H

H H(1/4)

H

S

Tank 5 Certify Test Switch

HS05

KeySw

N/A

N/A Test

H

H H(2/1)

H

S

Tank 6 Certify Test Switch

HS06

KeySw

N/A

N/A Test

H

H H(2/2)

H

S

Tank 7 Certify Test Switch

HS07

KeySw

N/A

N/A Test

H

H H(2/3)

H

S

Tank 8 Certify Test Switch

HS08

KeySw

N/A

N/A Test

H

H H(2/4)

H

S

Tank 9 Certify Test Switch

HS09

KeySw

N/A

N/A Test

H

H H(3/1)

H

S

Tank 10 Certify Test Switch

HS10

KeySw

N/A

N/A Test

H

H H(3/2)

H

S

Tank 11 Certify Test Switch

HS11

KeySw

N/A

N/A Test

H H(3/3)

H

S

Tank 18 Certify Test Switch

HS18

KeySw

N/A

N/A Test

H H(3/4)

H

S

Tank 18A Certify Test Switch

HS18A

KeySw

N/A

N/A Test

H H(4/1)

H

S

Tank 21 Certify Test Button

LE21

KeySw

N/A

N/A Test

H H(4/2)

H

S

Tank 22 Certify Test Button

LE22

KeySw

N/A

N/A Test

H H(4/3)

H

S

ABBREVIATIONS

PLANT Local Fuel PLC - The Shoreham Oil Terminal

SIS - Safety Instrument System

(1) Reset Required to clear alarms.

TITLE

OIC - Output Input Fault

(2) Results P (or

P

) = Pass, C = Comments, F (or X) = Fail

ESD - Emergency Shutdown

(3) xx = Tank Number under test only.

LB - Line Break

(4) Future (Italics, Blue fill). Review if installed.

SC - Short Circuit

(5)

H - Hardwired / Hardware

(6)

SHEET 3 OF 6

S - Software

CLIENT DRG No.

REF N0. LF364003_SCH

ORIGIN

INTIAL & DATE ON COMPLETION

B 13.05.16

LF364012_RPT - LFS-SIS1 Shutdown Conditions Proof Testing - Drexelbrook Manufacturers Test Facility Functional Testing

DATE BY DRN

As Built Original Issue for Review

MM LF PLC

CHK'D

APPD

DESCRIPTION

A

Overfill Protection LFS-SIS1 Testing Matrix

Valve Closing Time amended (Sht 2)

LF PLC

DBF

MM MM

DBF DBF MM

08.04.15

NOTES

REFERENCE DRAWINGS

REV