SIS FINAL ELEMENTS

Pipeline Import Valve

Tank 1 Import Valve (Future)

Tank 1 Export Valve (Future)

Tank 1 VRU Feed Valve (Future)

Tank 1 VRU Return Valve (Future)

Tank 2 Import Valve (Future)

Tank 2 Export Valve (Future)

Tank 2 VRU Feed Valve (Future)

Tank 2 VRU Return Valve (Future)

Tank 3 Import Valve (Future)

Tank 3 Export Valve (Future)

Tank 3 PUL Return Valve (Future)

Tank 4 Import Valve (Future)

Tank 4 Export Valve (Future)

Tank 4 VRU Feed Valve (Future)

Tank 4 VRU Return Valve (Future)

Tank 5 Import Valve (Future)

Tank 5 Export Valve (Future)

Tank 6 Import Valve (Future)

Tank 6 Export Valve (Future)

Tank 7 Import Valve (Future)

Tank 7 Export Valve (Future)

Tank 8 Import Valve (Future)

Tank 8 Export Valve (Future)

Tank 9 Import Valve (Future)

Tank 9 Export Valve (Future)

Tank 10 Import Valve (Future)

Tank 10 Export Valve (Future)

TESTING RESULTS

LF364012_RPT - Shutdown Conditions Proof Test

Procedure Review (P,C or F tank under test ).

Plant Preparations (P,C or F tank under test ).

Healthy and Reset (P,C or F tank under test ).

All XV's Open (P,C or F tank under test ).

SIF / Diagnostics (P,C or F tank under test).

TAG

XV162

XV123

XV124

XV155

XV156

XV121

XV122

XV157

XV158

XV129

XV130

XV159

XV126

XV127

XV160

XV161

XV118

XV119

XV116

XV117

XV114

XV115

XV110

XV111

XV108

XV109

XV106

XV107

Section

8.1.1

8.1.2

8.1.3

8.1.4

8.1.5

ACTION

Close / Inhibit

Enabled

Enabled

Enabled

Enabled

Enabled

Enabled

Enabled

Enabled

Enabled

Enabled

Enabled

Enabled

Enabled

Enabled

Enabled

Enabled

Enabled

Enabled

Enabled

Enabled

Enabled

Enabled

Enabled

Enabled

Enabled

Enabled

Enabled

Action

Confirm

Confirm

Confirm

Confirm

Confirm

DESCRIPTION

TAG TYPE CALIBRATION UNITS SET

FAILURE MODES

AC PSU Fuse Fail

L/5

Fail

N/A

N/A Fail

H

H H H H H H H H H H H H H H H H H H H H H H H H H H H

ESD DC Fuse Fail

24V/1

Fail

N/A

N/A Fail

H

H H H H H H H H H H H H H H H H H H H H H H H H H H H

XV162 ESD Open Circuit

TB4/25 - 26

LB

N/A

N/A Fail

H

XV162 ESD DB Power Fail

9L1

Tripped

N/A

N/A Tripped

H

ABBREVIATIONS

PLANT Local Fuel PLC - The Shoreham Oil Terminal

SIS - Safety Instrument System

(1) Reset Required to clear alarms.

TITLE

OIC - Output Input Fault

(2) Results P (or

P

) = Pass, C = Comments, F (or X) = Fail

ESD - Emergency Shutdown

(3) xx = Tank Number under test only.

LB - Line Break

(4) Future (Italics, Blue fill). Review if installed.

SC - Short Circuit

(5)

H - Hardwired / Hardware

(6)

SHEET 6 OF 6

S - Software

CLIENT DRG No.

REF N0. LF364003_SCH

B

APPD

DESCRIPTION

Valve Closing Time amended (Sht 2)

13.05.16 MM MM DBF

LF PLC

A 08.04.15 DBF DBF

LF364012_RPT - LFS-SIS1 Shutdown Conditions Proof Testing - Failure Mode Functional Testing

NOTES

REFERENCE DRAWINGS

REV DATE BY

MM MM LF PLC

As Built Original Issue for Review

Overfill Protection LFS-SIS1 Testing Matrix

DRN

CHK'D

ORIGIN

INTIAL & DATE ON COMPLETION