Previous Page  1818-1819 / 2239 Next Page
Information
Show Menu
Previous Page 1818-1819 / 2239 Next Page
Page Background

Commissioning – Dose Calculation Engine

• Identify the algorithm type and special issues

• Define an efficient plan for data collection, dose distribution comparisons and

analysis of results

Create work

plan

• Plan and Measure

• Transfer

• Analyse and Prepare data for TPS

Perform

measurements

• Verify input data

Check and

Beam

modeling

Utretch 2016

• Confirm machine/beam configuration

• Determine beam modelling fitting parameters

configure

• Compare beam specific calculations with measured data

• Beam, algorithm and clinical specific calculations

Perform

Calculation

Checks

• Verify that the calculations perform as expected in the user’s hands

• Verify behaviour over the range of expected clinical usage and at the limits set for

clinical use

• Verify calculation techniques and plan comparison tools

Comparison

and Analysis

26

Plan

Comparison

tools

Standards

Performance

testing