Simon Storage Ltd – Immingham East Terminal

Gasoline Import – Layers of Protection Analysis

P & I Design Ltd

DOCUMENT NO: SI057001_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: G DATE: 29.06.12

Tel: + 44 (0)1642 617444

PAGE 11 OF 34

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

For Environmental Hazards the tolerable risk levels are based on those given in Appendix 2

of the Process Safety Leadership Group (PSLG) final report into the Buncefield explosion.

These figures are based on information in document Integrated Pollution Prevention and

Control (IPPC) and Environmental Assessment and Appraisal of BAT.

Consequence

Definition

Acceptable if

frequency less than

Unacceptable if

frequency more

than

Minor:

Nuisance onsite only. No

off-site effects.

All shown as

acceptable

-

Noticeable

Minor breach of

permitted emission limits,

but no environmental

harm

10

-2

per year

~ 10 per year

Significant

Major breach of

permitted emissions limits

with possibility of

prosecution

10

-4

per year

10

-1

per year

Severe

Public warning and offsite

emergency plan invoked

Hazardous substance

releases into water course

with ½ mile effect

10

-6

per year

10

-2

per year

Major

Serious toxic effect on

beneficial or protected

species

Widespread but not

persistent damage to land

10

-6

per year

10

-4

per year

Catastrophic Major airborne release

with serious off-site

effects

Site shutdown

Serious contamination of

groundwater or

watercourse with

extensive loss of aquatic

life

10

-6

per year

10

-4

per year

Table 4 - Environmental Tolerable Risk Frequency