5.3.2 Initiating Event Likelihood (Ref. PSLG Guidelines, Clauses 55-57)

Initiating events were determined using a demand tree

Overfill of tank

Three of the initiating events were identified as the controlling factors in a possible

overfill:

Incorrect Routing on import

Incorrect Ullage in receipt tank. (Not enough ullage to take full import quantity)

Failure of ATG (Sticks or reads low)

Failure of ATG

whilst filling

Incorrect

Routing on

import

Incorrect

Ullage in

receipt tank

Valve failure

(or passing)

Changes in

filling rate

Failure to

terminate import

at ship