18-32 Edition 47

Track Loaders

Production and Machine Selection Nomograph

To find required bucket payload and bucket size

1) Enter Scale A cycles per hour (100) and B hourly

production 200 m

3

/hr (262 yd

3

/hr).

2) Connect A and B and extend to C to find required

payload 2.0 m

3

(2.62 yd

3

).

3) Connect C to bucket fill factor on Scale D (110%)

and extend to E to find required bucket size 1.8 m

3

(2.35 yd

3

).

4) Transfer Scale A and C readings to nomograph on

following page.

200

180

160

140

120

100

80

60

50

40

30

25

20

18

16

14

12

10

9

8

7

6

1000

800

600

500

400

300

200

150

120

100

80

60

50

40

30

20

15

12

10

700

600

500

400

300

200

150

100

80

60

50

40

30

20

15

12

10

8

7

5

6

4.5

5 4

3.5

3 4

2.5

2

3

1.5 2

1

1

1.5

1

1.5

1

1.25

1.5

2

2

4

4

5

7

5

4.5

3

3.5

2.5

.75

6

3

120%

100

80

60

50

40

A

B

C

D

E

Cycles

per Hour

Hourly

Production

Required

Required

Payload

Volume

Bucket Fill

Factor

Required

Bucket

Volume

yd

3

m

3

m

3

/cycle yd

3

/cycle

yd

3

/hr

m

3

/hr