Rippers

Estimated Ripper Production Graphs

●

D8R/D8T

●

D9R/D9T

CONSIDERATIONS FOR USING

PRODUCTION ESTIMATED GRAPHS:

●

Machine rips full-time — no dozing.

●

Power shift tractors with single shank rippers.

●

100% efficiency (60 min hour).

●

Charts are for all classes of material.

●

In igneous rock with seismic velocity of 8000 fps

(2450 mps) or higher for the D11T, and 6000 fps

(1830 mps) or higher for the D10T2, D9R/D9T and

D8R/D8T, the production figures shown should be

reduced by 25%.

●

Upper limit of charts reflect ripping under ideal con-

ditions only. If conditions such as thick lamination,

vertical lamination or any factor which would adversely

affect production are present, the lower limit should

be used.

B

A

2

3

4

5

6

7

8

250

500

750

1000

1250

1500

1750

2000

2250

2500

2750

3000

3250

1

2

250

500

750

1000

1250

1500

1750

2000

2250

2500

B

2 3 4 5 6 7 8

250

500

750

1000

1250

1500

1750

2000

2250

2500

2750

3000

3250

250

500

750

1000

1250

1500

1750

2000

2250

2500

1

2

A

SEISMICVELOCITY (in meters per second x 1000)

KEY

A — IDEAL

B — ADVERSE

SEISMICVELOCITY (in feet per second x 1000)

D9R/D9TWITH SINGLE SHANK

PRODUCTION (BCY/hour)

PRODUCTION (Bm

3

/hour)

SEISMICVELOCITY (in meters per second x 1000)

SEISMICVELOCITY (in feet per second x 1000)

D8R/D8TWITH SINGLE SHANK

PRODUCTION (BCY/hour)

PRODUCTION (Bm

3

/hour)