23-290 Edition 47

Wheel Loaders

IntegratedToolcarriers

Production and Machine Selection Nomograph

To find required bucket payload and bucket size

1. Enter required hourly production on Scale B 230 m

3

/hr

(300 yd

3

/hr).

2. Enter cycles per hour on Scale A (60 ÷ .6 = 100

×

.75 = 75 cycles/hr).

3. Connect A through B to C. This shows a required

payload of 3 m

3

(4 yd

3

) per cycle.

4. Enter estimated bucket fill factor on Scale D (0.95).

5. Connect C through Scale D to E for required bucket

size 3 m

3

(4 yd

3

).

6. Transfer cycles per hour Scale A and required pay-

load Scale C to the following page.

m

3

/cycle

yd

3

/cycle

m

3

/hr

yd

3

/hr

m

3

yd

3

A

B

C

D

E

Cycles

per hour

Hourly

Production

Volume

Required

PayloadVolume

Bucket Fill

Factor

Required

Bucket