Previous Page  36 / 68 Next Page
Information
Show Menu
Previous Page 36 / 68 Next Page
Page Background

36

Table 13: Evaluating shoreline protection function of mangroves in urban areas in Central African coast from

Cameroon to DRC

Country/Zone/Site/Type of infrastructure

Cost/ha

Fcfa

US Dollars*

Cost

SE

Cost

SE

Cameroon

Littoral Region

Electricity (transmission poles, etc)

280 000

60 0

560

120

Houses (simple, single storey, multistorey)

15 584 000

3 143 591

31 168

6 287

Institutional (schools, markets, spiritual, sports, military, etc)

256 128 000

51 193 602

512 256 102 387

Roads(tarred and non tarred including bridges)

824 000

62 758

1 648

526

Telecommunications (Poles/antennals, transmission stations, etc)

19 200 000

2 400 0

38 400

4 800

Total Littoral Region

292 016 000

14 957 870

584 032 29 916

Average Cameroon

292 016 000 14 957 870 584 032

29 916

Gabon

Estuary Province Libreville Council area

Electricity (transmission poles, etc)

100 000

31 0

200

62

Houses (simple, single storey, multistorey)

3 380 000

411 2 8

6 760

822

Total Estuary Province Libreville Council area

3 480 000

351 648

6 960

703

Average Gabon

3 480 000

351 648

6 960

703

Congo

Pointe Noire Division

Electricity (transmission poles, etc)

100 000

28 0

200

56

Houses (simple, single storey, multistorey)

6 000 000

5 0

12 000

1 000

Total Pointe Noire Division

6 100 000

1 008 85

12 200

2 018

Average Congo

6 100 000

1 008 850

12 200

2 018

DRC

Lower Congo Province, Boma district

Electricity (transmission poles, etc)

100 000

25 0

200

50

Houses (simple, single storey, multistorey)

1 200 000

105 0

2 400

210

Roads(tarred and non tarred including bridges)

1 000 000

75 0

2 000

150

Total Lower Congo Province, Boma district

2 300 000

3 8 296

4 600

677

Average DRC

2 300 000

338 296

4 600

677

Average urban mangroves

75 974 000

9 099 707

151 948

18 199