Background Image
Previous Page  29 / 44 Next Page
Information
Show Menu
Previous Page 29 / 44 Next Page
Page Background

CAPITAL EQUIPMENT NEWS

MAY 2015

27

GOLDHOFER HEAVY-DUTY MODULES QUALIFIED SOLUTIONS FOR EXTREME TRANSPORT CHALLENGES. Our heavy-duty modular systems can be individually matched to meet your requirements. At Goldhofer, providing qualified solutions means not only building resilient high quality products, but also giving our customers highly functional solutions for transportation and logistic challenges. Through our comprehensive project engineering and competent after sales program, Goldhofer is there when you really need to get down to business. Goldhofer products are the result of over 300 years of investment, development of new technologies, and perfection of our customer service. One thing is absolutely clear; Economy is ultimately a function of high resale value, long term durability, and safety. This is what we stand for and promise. Invest in your future. Goldhofer – The Original.

GOLDHOFER TRANSPORT OPERATION

from Turkey to Iraq

A

n impressive transportation milestone

was set by the Turkish heavy haulage

specialist Botros-Yigit-Nata (BYN) using

innovative equipment supplied by Goldhofer

Aktiengesellschaft. To move a 247 t refinery

boiler with a length of almost 62 m (and a

diameter of 3.5 m) from the port in Iskenderun

to a refinery in the oil-rich city of Erbil (Iraq),

BYN employed a combination of two Gold-

hofer ten-axle THP/SL heavy-duty modules.

The refinery boiler was first shipped from

Jebel Ali (United Emirates) to the Turkish port

of Iskenderun. From there, BYN’s specialists

took the huge load by road over a distance

of 1 150 km to its final destination in Erbil.

That was the first time a load of this size had

ever been transported to Iraq via Turkey in a

single operation. The journey from Iskenderun

to Erbil lasted a total of twenty days.

“Everything went smoothly. We spent six

months planning the project and performing

a detailed inspection of the roads down to the

very last bend. Once we had the permits for

the journey, it was simply a question of the

reliability of our Goldhofer modules. And they

did not let us down once,” says BYN general

manager Aydin Fatah.

At a gross combination length of almost

70 m, the Goldhofer axle lines showed what

they are capable of. With a suspension stroke

of ± 300 mm and a high bending moment,

they are the ideal solution for transporting

long loads in off-road conditions. With a load

height of 5.25 m, the boiler transportation op-

eration was a real eye-catcher on the journey

across Turkey.

“It’s gratifying to see customers place their

trust in our technology for the really challeng-

ing missions and break new ground in the

process. We provide the ideal basis for han-

dling landmark projects,” says Stefan Fuchs,

CEO of Goldhofer Aktiengesellschaft.

b

TRANSPORT