Table of Contents Table of Contents
Previous Page  59 / 74 Next Page
Information
Show Menu
Previous Page 59 / 74 Next Page
Page Background

Conoco Phillips Energy – Bramhall Terminal

Safety Instrument System – Compliance Document

P & I Design Ltd

DOCUMENT NO: SI297021_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 30.06.11

Tel: + 44 (0)1642 617444

PAGE 12 OF 15

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

Stage 3 – Safety Instrument System Validation

Checklist 8 – Site Acceptance Test

Item

No

BS EN

61511

Clause

Description

Checklist

Yes-No-

N/A

Comments and

References

8.1

15.2.1

Has a test plan been produced to cover the following:

Responsibilities for testing

Testing Criteria

Special requirements for start up, shutdown &

maintenance

Component failure testing

Any special preparations or effects on operating plant

during the test

Partial testing if it not possible to complete the full testing

Testing Schedule

Testing Procedures

Yes

8.2

15.2.3

Where the SIS components require measurement

calibration:

Has this been completed

Are the results within the required tolerance

N/A

8.3

15.2.4

Is the SIS documentation as the installed system

Yes

8.4

15.2.4

Does the SAT testing include for the following:

Checks to ensure the SIS performs during:

Start up/Shut down

Loss of power/Loss of air

Yes

8.5

15.2.4

Does the SAT testing include for the following:

That the SIF performs as specified

That any external manual shutdown or non SIS functions

cannot impair the operation of the SIS

Yes

8.6

15.2.4

Does the SAT testing include external interfaces:

BPCS

Annunciation

Diagnostics

Yes

8.7

15.2.4

Have the following been checked for correct operation:

Reset

Bypass facilities

Start up overrides

N/A

8.8

15.2.4

Following the SAT have:

All test results been recorded

Yes

8.9

14.2.5

Have any modifications been necessary throughout the

SAT phase and if so:

Have the modifications been reviewed with the design

engineers to review the impact on the SIS and

Have any associated modifications to the documentation

been carried out

No