Contract for Services
7/13/17
Sabra Atkins M L Property Group C-646
Dunwoody Exchange 4237 North Shallowford Road
Atlanta
Jobsite Information
Customer Information
Accepted by the Customer
ESOG Signature
Presented by ESOG
Customer Signature
Payment Schedule
Total Contract Amount
satkins@mlpropgroup.com4237 North Shallowford Road
Atlanta
ENGINEERED SOLUTIONS OF GEORGIA PROPOSES TO FURNISH AND INSTALL THE FOLLOWING SCOPE OF WORK:
satkins@mlpropgroup.com$32,812.50
Print Name
Quotation valid for 30 days from the date of issue. Contract subject to terms and conditions printed on the accompanying addenda.
Sabra Atkins M L Property Group C-646
Commercial
Date
Print Name
Chuck Irby
$8,204.00
$24,608.50
2260 Northwest Parkway • Suite H • Marietta, GA 30067 • 678-290-1325
Sabra Atkins M L Property Group C-646
To perform a Pressure Grouting Program for the purpose of stabilizing and properly filling the large Sinkhole beneath the Decks
and Steps at the front of building 4025 (Approx. 35’x12’x15’ deep).
1.
Mobilize Drill and Grout Casing to Site.
2.
Drill Grout Casings through Debris Pit to a depth where firm soils are encountered at multiple Locations.
3.
Mobilize Line pump and related grouting equipment to site
4.
Inject Low Density Cellular Grout into Pit as grout casings are extracted..
5.
Estimated grout take is 650 cuft based on industry standard calculations. Additional grout, if required shall be billed at $28.50 per cubic foot beyond
650 cubic feet.
6.
Insure all voids are filled and soils are compacted.
7.
Clean up and remove all construction debris.
LIFT AND INSTALL PERMANENT FOUNDATION FOR PORCH
1.
Install temporary supports and lift front deck as close as possible to original elevation
2.
Pour new footings with rebar grid, 18”x18”
3.
Allow for concrete to remain above grade with tapered top to provide water run off
4.
Attach existing post to new footing and anchor
5.
Secure framing
6.
Clean area and remove debris