Previous Page  61 / 84 Next Page
Information
Show Menu
Previous Page 61 / 84 Next Page
Page Background

New-Tech Magazine Europe l 61

components suitable for space

applications. Requirements vary

widely depending on many factors

including the component type,

materials, and other details specific

to the flight program. Mini-Circuits

has successfully screened hi-rel

components for a range of space

requirements, and this experience

has enabled us to develop well-

established qualification processes

for these demanding applications.

For more information about qualifying

parts for space applications, please

contact our applications team

3

Qualification Flow

Units from Stock

or New Production

DPA

a)

External visual

inspection

b)

Prohibited materials

analysis of external

surfaces

c)

Internal visual inspection

of sectioned devices

Thermal Shock

-55 to +125˚C

10 Cycles,

10 Minutes

Bake-In

24 hr. stabilization

bake exposure at

+100˚C

Real-Time

Radiographic

Inspection

2 views

Final

Visual/Mechanical

Inspection

10x magnification; 5

units inspected for

dimension

Humidity

+85˚C and +85RH,

1.3VDC ±0.25VDC

test voltage applied

Destructive

Electrical Screening

@ +25˚C, -55˚C,

and +100˚C;

samples soldered

on PCB

Solderability

Units soldered on

test board and

inspected per

IPC-A-610

GROUP A

100% Screening

Leach Resistance

Immersion in

+260˚C solder,

10 sec.

Terminal Strength

Push force of

0.5mm/s applied to

samples soldered to

test board

GROUP B

Sample Screening

12 Units

10 Units

5 Units

3 Units

3 Units

Figure 2: Qualification flow for LTCC low pass filter for a specific space flight program.

3

Qualification Flow

Units from Stock

or New Production

DPA

a)

Extern l visual

inspection

b)

Prohibi d materials

analysis of external

surfaces

c)

Intern l vi ual inspection

f sectioned devices

Thermal Shock

-55 to +125˚C

10 Cycles,

10 Minutes

Bake-In

24 hr. stabilization

bake exposure at

+100˚C

Real-Time

R diographic

Inspection

2 views

Final

Visual/Mechanical

Inspection

10x m gnification; 5

units inspected for

d mension

Humidity

+85˚C and +85RH,

1.3VDC ±0.25VDC

test voltage applied

Destructive

Electrical Screening

@ +2 ˚C, -55˚C,

and +100˚C;

samp es soldered

on PCB

Solderability

Units soldered on

test board and

inspected per

IPC-A-610

GROUP A

100% Screening

Leach Resistance

Immersion in

+260˚C solder,

10 sec.

Terminal Strength

Push force of

0.5mm/s applied to

samp es soldered to

test board

GROUP B

Sample Screening

12 Units

10 Units

5 Units

3 Units

3 Units

Figure 2: Qualification flow for LTCC low pass filter for a specific space flight program.

Qualification Flow

Units from Stock

or New Production

DPA

a)

External visual

inspection

b)

Prohibited materials

analysis of external

surfaces

c)

Internal visual inspection

of sectioned devices

Thermal Shock

-55 to +125˚C

10 Cycles,

10 Minutes

Bake-In

24 hr. stabilizatio

bake exposure at

+100˚C

Real-Time

Radiographic

Inspection

2 views

Final

Visual/Mechanical

Inspection

10x magnification; 5

units inspected for

dimension

Humidity

+85˚C and +85

1.3VDC ±0.25V

test voltage appl

Destructive

Electrical Screen

@ +25˚C, -55˚

and +100˚C;

samples solder

on PCB

Solderability

Units soldered

test board an

inspected per

IPC-A-610

GROUP A

100% Screening

Leach Resistan

Immersion in

+260˚C solder

10 sec.

Terminal Stren

Push force o

0.5mm/s applie

samples soldere

test board

Figure 2: Qualification flow for LTCC low pass filter for a specific space flight pr

Table 1: Screening process summary