Background Image
Previous Page  43 / 52 Next Page
Information
Show Menu
Previous Page 43 / 52 Next Page
Page Background

PRODUCT News

February 2015

MODERN MINING

41

Hytec Services Africa (HSA), a Hytec Group

company, recently completed the supply

and installation of a lube and coolant dis-

pensing system at Acacia Mining’s North

Mara goldmine, located in a remote corner

of northern Tanzania. (Acacia was previ-

ously known as African Barrick Gold.)

The dispensing system enables more

responsive, immediate and efficient ser-

vicing and maintenance capabilities for

the mine’s heavy mobile material handling

fleets, comprising haul trucks, graders,

loaders and shovels.

The maintenance of heavy mobile

equipment in operation at North Mara was

previously constrained by the significant

distance between the main equipment

workshops and the remote workshop

located at an opencast pit. A more auto-

mated dispensing system – to facilitate

faster fluid ‘top ups’ – was required for a

more effective operation, for which HSA

was contracted.

The system covers the complete fluid

management and distribution

process, from the bulk offloading

of fluids from tankers into 20 000

litre holding tanks (coolant and

transmission oil are stored in

1 000 litre tanks), as well as the

steel pipe infrastructure for

transfer into remote hose reels,

from where machine services

can be carried out.

The dispensing system con-

sists of seven steel dispensing

lines dedicated for engine oil,

transmission oil, two variants of hydraulic

oil, coolant, compressed air, as well as a

waste oil pipe for the safe removal of used

oil from the site. Grease points were also

provided. Each oil and coolant flow is fil-

tered through Bosch Rexroth duplex filters,

while the bulk tanks are protected with

Hy-Pro desiccant breathers.

HSA, together with Hytec, executed

the design and layout of the entire dis-

pensing system. All the stands for the bulk

Hytec delivers dispensing system to North Mara gold mine

offloading pumps, filter stands, waste oil

pumps, as well as the cabinets for hose

reels, were designed and built by Hytec.

Hytec’s Installation and Servicing depart-

ments were involved in the pre-assembly

of pipework in South Africa, as well as its

final installation on site.

HSA coordinated the project, including

the logistics of delivering materials, equip-

ment and personnel to the site.

Gary Shaw, Hytec Services Africa, tel (+27 11) 573-5460

Holding tanks – of 1 000 and 20 000 litre capacity – store the various

lubricants and coolants required at the North Mara gold mine site.