Acceptance and Commissioning Phase
•
Acceptance phase
•
Performance of equipment meets the minimum requirements
(manufacturer’s guidelines)
•
Commissioning phase
•
Is the process through which all the possible machine characteristics
relevant to clinical use are investigated, measured, and recorded
(medical physicist’s guidelines)
•
Data is the standard for clinical use and should be verified periodically
Vendor provided data could only be used as a reference but it should never be
used as a substitute for the commissioned data!