Southern Corridor GRIP 2017–2026 |

23

TSO PROJECTS

No. Project

TYNDP Code

Commissioning

(TYNDP 2017)

Status

TSO/Sponsor

1 Komotini – Thesprotia pipeline

TRA-N-014

2023*

Non-FID

PCI 7.1.7

2 Compressor Station at Kipi

TRA-N-128

2020

Non-FID

PCI 6.9.3

PCI 7.1.2

PCI 7.4.1

3 Greek part of Tesla project

TRA-N-631

2020

Non FID

PCI 6.25.2

• 4 M/R station at Komotini

TRA-N-940

2020

Non_FID

PCI 7.1.6

• 5 M/R station at Nea Messimvria

TRA-N-941

2019

FID

PCI 7.1.6

• 6 M/R at Komotini to IGB**

TRA-N-957

2020

Non-FID

7 M/R at Alexandroupoli

TRA-N-1090

2020

Non-FID

• 8 M/R at UGS South Kavala

TRA-N-1092

2023

Non-FID

• 9 M/R at Megalopoli

TRA-N-1091

2022

Non-FID

10 Nea-Messimvria to FYRoM pipeline TRA-N-967

2020

Non-FID

11

Compressor station at Nea

Messimvria for connection to TAP

TRA-N-971

2022

Non-FID

12 Revythoussa (2

nd

upgrade)

LNG-F-147

2018

FID

THIRD PARTY PROJECTS

No. Project

TYNDP Code

Commissioning

(TYNDP 2017)

Status

TSO/Sponsor

1

LNG terminal in northern Greece/

Alexandroupolis – LNG Section

LNG-N-062

2018

Non-FID

PCI 6.9.1

2

LNG terminal in northern Greece/

Alexandroupolis – Pipeline Section

TRA-N-063

2018

Non-FID

PCI 6.9.1

3 South Kavala UGS

UGS-N-385

2022

Non-FID

4

Interconnector Greece-Bulgaria

(IGB Project)

TRA-F-378

2018

FID, PCI 6.8.1

• Project not marked on the map

* This project is on hold due to lack of expression of interest by the market

** This project is included in the TYNDP 2017– 26 but will most probably be part of the IGB project