BUSINESS OVERVIEW
06
6.3 Overview and strategy of the group
THE GROUP’S BUSINESSES
The group’s operations in the nuclear power sector concern the following segments:
Extraction
d’uranium
Chimie de
l’uranium
Démantèlement
des sites
nucléaires
Production
d’énergie /
Exploitation /
Services
Enrichissement
Fabrication
de MOX
Fabrication de
combustible UO
2
Gestion du
combustible
usé
Nuclear materials shipping (uranium, fuel, used fuel, waste)
Storage services and solutions
Cask design and manufacturing
Logistics services
Engineering support to the operator
Full-scope engineering, procurement, construction and management (EPCM)
Uranium
mining
Uranium
chem stry
Nuclear site
dismantling
Energy
production /
O eration /
Enrichment
MOX
fabrication
UO
2
fuel
fa rication
Used fuel
management
Post operation
Exploration,
extraction
and
processing
of natural
uranium
Natural
uranium
conversion
into uranium
hexafluoride
(UF
6
)
UF
6
enrichment
by ultra
centrifugation
Used fuel
treatment
Fuel assembly
design and
fabrication
Reactor design
and construction
(NSSS, nuclear
island)
Equipment
manufacturing
Safety improve-
ment, maintenance,
control and
upgrades of nuclear
islands
Production and
installation of
instrumentation and
control systems
NewCo consolidation scope
AREVA NP consolidation scope
Mining
Front End
Recycling
Dismantling & Services
Logistics
AREVA Projects
Fuel
Installed Base
Components
Large Projects (excluding OL3 project)
Technical & Engineering Department
Instrumentation & Control
AREVA Projects
of sites and
facilities at the
end of operations
Operating
services
Source:AREVA.
At December 31, 2016, the following operations meet the criteria in IFRS 5 for
classification as “operations sold, discontinued or held for sale” and no longer
contribute to the key financial indicators reported by AREVA:
p
New AREVA Holding, temporarily called “NewCo”;
p
AREVA NP (excluding the OL3 contract), corresponding to the “New NP”
consolidation scope;
p
Nuclear Measurements (Canberra);
p
Propulsion and Research Reactors (AREVA TA);
p
Solar Energy;
p
Wind Energy (Adwen).
The bioenergy operations, which are to be discontinued, do not meet the criteria set
by the accounting standards for classification in discontinued operations because
of two ongoing contracts.
Details on the adoption of IFRS 5 are given in Section 9.2.
Situation and activities
of the company and its subsidiaries by business segment during the yea
r and in
note 3 of the
Notes to the consolidated financial statements.
2016 AREVA
REFERENCE DOCUMENT
55