Table of Contents Table of Contents
Previous Page  55 / 386 Next Page
Information
Show Menu
Previous Page 55 / 386 Next Page
Page Background

BUSINESS OVERVIEW

06

6.3 Overview and strategy of the group

THE GROUP’S BUSINESSES

The group’s operations in the nuclear power sector concern the following segments:

Extraction

d’uranium

Chimie de

l’uranium

Démantèlement

des sites

nucléaires

Production

d’énergie /

Exploitation /

Services

Enrichissement

Fabrication

de MOX

Fabrication de

combustible UO

2

Gestion du

combustible

usé

Nuclear materials shipping (uranium, fuel, used fuel, waste)

Storage services and solutions

Cask design and manufacturing

Logistics services

Engineering support to the operator

Full-scope engineering, procurement, construction and management (EPCM)

Uranium

mining

Uranium

chem stry

Nuclear site

dismantling

Energy

production /

O eration /

Enrichment

MOX

fabrication

UO

2

fuel

fa rication

Used fuel

management

Post operation

Exploration,

extraction

and

processing

of natural

uranium

Natural

uranium

conversion

into uranium

hexafluoride

(UF

6

)

UF

6

enrichment

by ultra

centrifugation

Used fuel

treatment

Fuel assembly

design and

fabrication

Reactor design

and construction

(NSSS, nuclear

island)

Equipment

manufacturing

Safety improve-

ment, maintenance,

control and

upgrades of nuclear

islands

Production and

installation of

instrumentation and

control systems

NewCo consolidation scope

AREVA NP consolidation scope

Mining

Front End

Recycling

Dismantling & Services

Logistics

AREVA Projects

Fuel

Installed Base

Components

Large Projects (excluding OL3 project)

Technical & Engineering Department

Instrumentation & Control

AREVA Projects

of sites and

facilities at the

end of operations

Operating

services

Source:AREVA.

At December 31, 2016, the following operations meet the criteria in IFRS 5 for

classification as “operations sold, discontinued or held for sale” and no longer

contribute to the key financial indicators reported by AREVA:

p

New AREVA Holding, temporarily called “NewCo”;

p

AREVA NP (excluding the OL3 contract), corresponding to the “New NP”

consolidation scope;

p

Nuclear Measurements (Canberra);

p

Propulsion and Research Reactors (AREVA TA);

p

Solar Energy;

p

Wind Energy (Adwen).

The bioenergy operations, which are to be discontinued, do not meet the criteria set

by the accounting standards for classification in discontinued operations because

of two ongoing contracts.

Details on the adoption of IFRS 5 are given in Section 9.2.

Situation and activities

of the company and its subsidiaries by business segment during the yea

r and in

note 3 of the

Notes to the consolidated financial statements.

2016 AREVA

REFERENCE DOCUMENT

55