Table of Contents Table of Contents
Previous Page  9 / 189 Next Page
Information
Show Menu
Previous Page 9 / 189 Next Page
Page Background

P & I Design Ltd

Process Instrumentation Consultancy & Design

2 Reed Street, Gladstone Industrial Estate,

Thornaby, TS17 7AF, United Kingdom.

Tel.

+44 (0) 1642 617444

Fax.

+44 (0) 1642 616447

Web Site:

www.pidesign.co.uk

IMMINGHAM STORAGE Co LTD

IMMINGHAM EAST TERMINAL

IME-SIS1

SAFETY INSTRUMENT SYSTEM

SAFETY REQUIREMENT SPECIFICATION

Rev

Date

By

Checked

Approved

Description

Client Ref.

A

27.07.10

D.S. Regan

MM

DRR

Original Issue

B

03.12.10

D.S. Regan

PJP

DRR

Revised as per discussions with

client

Document No.

SI277010_RPT

C

20.12.10

D.S. Regan

PJP

Client

Post FSA Stage 1

D

22.02.11

D.S. Regan

MM

Client

Revised following SIS Design

E

29.06.12

D.S. Regan

MM

Client

Revised following FSA Stage 3

F

19.06.13

D.B.Faulkner

DSR

Client

XV56701 Installed

G

31.10.14

D.B.Faulkner

DSR

ISCo

Scope Reduced to Tanks 561, 564

& 568

IF NOT SIGNED THIS DOCUMENT IS UNCONTROLLED