Table of Contents Table of Contents
Previous Page  34 / 188 Next Page
Information
Show Menu
Previous Page 34 / 188 Next Page
Page Background

32

Figure 2.1 Designed SSCSM model

Practical application of the designed SSCSMmodel will only rarely have the “linear”

form and will not be realised in such a transparent and clear manner. It will be necessary

to take into account the following facts:

1. The model will be carried out as an iterative process with returns to

previously adopted and re-evaluated procedures.

2. The partial elements in the designed model will often be interrelated.

3. The model will be conducted as a nonstandard, original and creative

process, which does not exclude the use of partial formal methods and

tools making the thought processes easier.

4. The model will be carried out as a process of continuous adaptation to changes

in the supply chain and business environment, which are continuous as well.