Immingham Storage Co Ltd

Immingham East Terminal

IME-SIS1

Safety Instrument System Shutdown Conditions Proof Testing Procedure

Controlled Copy 2017 Proof Test

P & I Design Ltd

DOCUMENT NO: SI483018_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 09.04.14

Tel: + 44 (0)1642 617444

PAGE 9 OF 17

Fax: + 44 (0)1642 616447

Controlled Copy 20170704

www.pidesign.co.uk

7

AS FOUND FUNCTIONAL PROOF TESTING PROCEDURE

7.1 TK561-SIF1 - Tank 561 As Found Functional Testing

Purpose of Test

To verify the as found operation of LE56101 Tank 561 Independent high high level trip closes XV56101

FINAL ELEMENT valve.

To verify the as found Manual Shutdown functions of Tank 561 FINAL ELEMENT XV56101 valve.

To verify the correct DIAGNOSTICS information.

If sensing element defective the tank could overfill if a demand is made on the overfill protection

system.

If manual shutdown systems defective the FINAL ELEMENT could fail to close if a demand is

made on the terminal shutdown systems.

If response target time is exceeded the tank could overfill following demand.

If FINAL ELEMENT travel time is reduced excessive pipeline surge pressure could be generated.

Diagnostic information not displayed correctly could result in undetected tank overfill, system

unavailability or incorrect operational response.

Controlled Copy Documentation Required

SI483012_SCH

IME-SIS1 Trip Matrix

Step

Method of Test

Acceptance Criteria

Pass (

)

Fail (x)

Initial

7.1.1 Review procedure with operations and

testing personnel.

All personnel familiarised with the scope

of works and responsibilities

.

Comment any issues in section 7.1.12

and review / rectify prior to starting

testing.

Pass

7.1.2

Confirm plant preparations

satisfactory.

Record PTW No

…06561 (Hot).

Conditions satisfied as detailed on PTW

and RAMS.

Comment any issues in section 7.1.12

and review / rectify prior to starting

testing.

Pass

7.1.3 Confirm system healthy and reset.

System healthy and reset as detailed on

SI483013_SCH Sheet 1.

Comment differences from SCH or if

found in tripped state in section 7.1.12.

Pass

7.1.3

XV56101 is normally in the open

position, if found closed open via local

manual isolation switch. (confirm

acceptance criteria @ step 7.1.7 if

found open)

Valve action found smooth.

Comment poor action / sticking in

section 7.1.12.

Pass

Opening time

No specific requirement.

Comment times > 120 seconds in section

7.1.12.

Pass

Correct FINAL ELEMENT valve

position and DIAGNOSTICS as detailed

on SI483012_SCH Sheet 1.

Comment differences from SCH in

section 7.1.12.

Pass

Tank 561 As Found Functional Testing Continued on page 10